This is one of the most exciting parts of any project. We're installing all the pretty finishes that we've been discussing for so long. That vision I've had in my head is finally becoming a reality!
Let's start upstairs. A couple of the original bedrooms didn't have closets. We're changing that, but it's a bit tricky with our slanted rooflines. This room is one example. There wasn't a closet (they had hanging clothes racks in the rooms), but I want to add one.
![]() |
| Our starting point |

I came up with this design weeks ago and it's so much fun to see Kyle turn it into reality. I've ordered baskets that will be 'drawers' on the left side and we're having custom made closet doors for the main hanging space. We're leaving this cute triangular section at the top open - it's perfect for displaying something!
![]() |
| Custom doors will be installed later |
![]() |
| Beadboard wainscoting |
Of course there's more to do, but look how much has changed. We've hidden all the plumbing, moved the window, added lots of insulation, a stone mosaic floor and beautiful woodwork.










No comments:
Post a Comment