Thursday, January 16, 2025

First Peeks of Kitchen Progress

With the new floor installed, we’re ready to move forward with the kitchen.  It's so exciting to see it come together, because the kitchen install is a long process.  We started months ago with all new electrical, plumbing and insulation.  That was followed by drywall and flooring.  It's taken 6 months to get to this point!


I chose a traditional style, in keeping with the age of the home. 


The biggest changes in this kitchen?  The ceiling height change and the big new window.  They both make the kitchen feel so much bigger and brighter!

Look at the change in ceiling height!


On the right side of the kitchen, in the space that used to be a closet, we have recessed the refrigerator into the wall.  And there is a step-in pantry next to it.

Look how bright the kitchen is now!
 

At the end of the kitchen, next to the window, there will be a tall, glass front cabinet.  It can't get installed until after the countertops are in place, so I'm trying to be patient and wait.


But even with all that storage, I thought it needed more, so an island will be installed, to provide even more space for all the essentials you need in a modern kitchen.


Once the cabinets are installed, the countertop folks need to create a manufacturing template and then we wait for that to be completed and the tops installed.  When that is done, the tall cabinet will get added as well as all the crown molding.  And the shelving and door need to be installed in the pantry.   Finally, I'll get the custom tile backsplash installed.  Still so much to do - but it's coming along!  

Pin It

1 comment:

  1. Wow! What a difference. Such a beautiful space!

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...