Notice the staircase to nowhere!!! |
Some were 12 inches apart, some were 20. And since they'd never been nailed into the carrying beam, they had also twisted over time.
![]() |
Modern building code requires even joist spacing - typically 16" apart |
But it was a big job. The guys had to take out the existing beams and subfloor, which created this weird open hole in the middle of the house. It was like a dollhouse with part of the house cut away.
I like an open floor plan, but this is ridiculous!!!
But with the old structure gone, the guys could quickly install the new custom joists and a robust subfloor above. Farewell squeaky floors
To finish the ceiling, we will install beadboard between each beam and then the whole ceiling will be painted white. It will still be a low ceiling by modern standards, but the added visual height between the beams will give it the illusion of taller ceilings. It will look so good! Although I will miss that giant open floor plan 😀
No comments:
Post a Comment